RedAnt
000
Lady Wellingdon colonnade
CASTLE Bratislava
Dural India
Valparai School
01020304
Architecture · Interiors · PMC · Conservation

We design spaces that inspire life.

Sixty-five documented projects across eight countries — heritage, institutional, industrial and residential.

Lady Wellingdon Conservation
Chennai · Heritage · Built 1922
Scroll
Heritage ConservationInstitutional & CSRIndustrial CommercialHealthcareHousingInteriors
Act I — Where we start

Some buildingsare worth saving.

A 1922 institution on Marina Promenade. Failing plaster, water in the parapet, a century of history in the joints. The easy answer was demolition. We were asked for the harder one.

Heritage interior
The scale of it

Hover to seewhat's behind the numbers.

0
Projects documented
0
Countries worked in
0
Sectors, one practice
0
Civic & CSR projects delivered
Act II — How it's made

Sketch to handover,inside one practice.

Most firms hand you off at the drawing. We carry the project through construction — which is exactly where design intent is usually lost.

05 stages

The whole chain.

Scroll to move through →

01 — SurveySurvey

Survey & Assessment

Condition survey, material sampling, structural appraisal. On heritage work nothing is touched until the building has been read properly.

02 — DrawingDrawing

Drawing & Documentation

Measured drawings, plans, sections and details resolved to the junction — documentation a contractor can actually build from.

03 — ModelModel

3D Coordination

A coordinated digital model. Clients walk the building, and clashes get resolved on screen instead of on site.

04 — BuildBuild

Construction & PMC

Project management on the ground — sequencing, quality control and weekly progress against the programme.

05 — HandoverHandover

Handover

Documentation, compliance sign-off, and a building that performs the way it was drawn.

01 / 05
Three that define us

Different problems.Same discipline.

Lady Wellingdon
Heritage · Conservation

Lady Wellingdon Conservation

A century-old institution stabilised and returned to daily use — repaired in lime, never rendered in cement, and sequenced so teaching never stopped.

LocationChennai
Built1922
ScopeConservation + PMC
Dural India
Industrial

Dural India Manufacturing

A 4.5-acre phased industrial campus. Column-free spans, service integration, and delivery held against a fixed production timeline.

LocationKanchipuram
Site4.5 acres
StatusPhase 1 live
CASTLE Bratislava
Housing · International

CASTLE, Bratislava

Five towers of mixed-use urban development in Slovakia — proof the practice operates under unfamiliar regulatory and construction frameworks.

LocationSlovakia
Scale5 towers
TypeMixed use
Act III — The evidence

Selected work.

Hover any project to preview it.

See all 65 projects
Act IV — Who does it

Led by the peoplewho do the work.

A building earns trust the same way a doctor does — by getting the details right when it actually matters.
F
Febin
Design Head & Managing Partner · 22 years
Good architecture is decided at the drawing board. Good buildings are decided on-site.
A
Ashik
Project Manager & Managing Partner · 13 years
Client validation
RedAnt understood exactlywhat we wanted before we did.
Amit ShahTrustee, Virtusa Foundation — Lady Wellingdon Conservation
Excellence in Heritage Conservation
Indian Institute of Architects · 2024
Start a conversation

Have a project in mind?

Share the brief and we'll respond with relevant delivery precedent and a capability statement.

Get in touch